水穩(wěn)料基層施工時會存在骨料離析問題

來源:http:/// 日期:2022-12-30
水穩(wěn)基層作為道路結構的主要承重層,基層在各個結構層中的地位是毋庸置疑的,但是在進行濟南水穩(wěn)料基層施工時,由于多方面的原因,還是會出現(xiàn)一些質量問題,其中骨料離析就是經(jīng)常出現(xiàn)的質量問題之一。
As the main bearing layer of the road structure, the water stabilized base course plays an undoubted role in each structural layer. However, during the construction of Jinan water stabilized material base course, due to various reasons, there will still be some quality problems, including aggregate segregation.
骨料離析是水穩(wěn)料基層施工時經(jīng)常出現(xiàn)的質量問題之一,在進行公路工程的水穩(wěn)料基層的施工過程中,如果不能對各個施工環(huán)節(jié)進行很好的控制,就會嚴重影響基層的整體強度及平整度。
Aggregate segregation is one of the quality problems that often occur in the construction of water stabilized material base course. In the construction process of water stabilized material base course of highway engineering, if each construction link cannot be well controlled, the overall strength and flatness of the base course will be seriously affected.
骨料離析的部位,會導致基層出現(xiàn)強度降低、平整度差、水穩(wěn)性差等問題,所以,公路工程施工技術人員在進行水穩(wěn)料基層施工時,要按照相關施工技術規(guī)范以及設計圖紙的要求進行施工,分析離析產(chǎn)生的原因,不斷總結經(jīng)驗教訓,多一份細心,少一份粗心,多一份責任,少一份推諉,大家齊心協(xié)力,盡可能避免骨料離析現(xiàn)象的發(fā)生,提高道路工程的建設質量。
The segregation of aggregates will lead to the lower strength, poor flatness, poor water stability and other problems of the base course. Therefore, the highway engineering construction technicians should carry out the construction of the water stabilized material base course in accordance with the requirements of the relevant construction technical specifications and design drawings, analyze the causes of segregation, constantly summarize the experience and lessons, be more careful, less careless, more responsible, less shirking, and work together, Avoid aggregate segregation as much as possible to improve the construction quality of road works.
濟南水穩(wěn)料
在進行水穩(wěn)料基層施工時,雖然做了大量的控制離析現(xiàn)象發(fā)生的措施,但還是不可能完全避免離析現(xiàn)象的發(fā)生,如果在進行水穩(wěn)基層施工時,攤鋪機后出現(xiàn)了明顯的“集料窩”或者“集料帶”,就要及時進行處理,處理的方法是在攤鋪機后安排2-3人的工人小組,將離析部位的混合料鏟除,換填級配合格的混合料。
During the construction of the water stabilized base course, although a lot of measures have been taken to control the occurrence of segregation, it is still impossible to completely avoid the occurrence of segregation. If there is an obvious "aggregate nest" or "aggregate belt" behind the paver during the construction of the water stabilized base course, it should be handled in a timely manner. The treatment method is to arrange a 2-3 person team behind the paver to remove the mixture at the segregation position, The mixture with qualified grading shall be replaced.
在進行水穩(wěn)料基層施工時,一定要特別注意離析的問題,從源頭就要進行控制,嚴格控制每一個施工環(huán)節(jié),發(fā)現(xiàn)離析現(xiàn)象要及時進行處理,只有施工人員不斷增強質量意識,嚴格按照公路基層施工技術規(guī)范以及設計文件的要求進行施工,使水穩(wěn)基層的施工質量得以保證,從而使整個公路工程的施工質量符合相關驗收規(guī)范的要求,使其使用壽命得以延長。
During the construction of water stabilized material base course, special attention must be paid to the problem of segregation. Control must be carried out from the source, and each construction link must be strictly controlled. If segregation is found, it must be handled in a timely manner. Only the construction personnel continuously enhance their quality awareness, and carry out the construction in strict accordance with the requirements of the highway base course construction technical specifications and design documents, so as to ensure the construction quality of water stabilized material base course, Thus, the construction quality of the entire highway project can meet the requirements of relevant acceptance specifications, and its service life can be extended.
水穩(wěn)料基層施工時會存在骨料離析問題基本內容就是以上所講解這樣了,您對此有怎樣的疑惑或者需求,就來我們網(wǎng)站http://咨詢看看吧!
The basic content of aggregate segregation during the construction of water stabilized material base course is explained above. If you have any doubts or needs, please come to our website http:// Consult!