水穩(wěn)拌合站生產(chǎn)效率的高低怎么處理?
水穩(wěn)拌合站生產(chǎn)效率的高低決定了整個工程進度的快慢。所以很多人問小編有沒有方法加快攪拌呢?下面小編就來為大家來具體介紹一下。
The production efficiency of the water stable mixing plant determines the speed of the entire project progress. So many people ask the editor if there is a way to speed up the stirring? Below, the editor will provide a specific introduction for everyone.
水穩(wěn)拌合站質(zhì)量的好壞也事關(guān)工程質(zhì)量,為了保證拌和質(zhì)量和拌合效率,可以用挖掘機翻倒,來平衡原材料的含水量。由于黑灰、白灰的含水量由許多不確定的因素決定,特別是白灰,消解質(zhì)量、自身質(zhì)量、是否過篩都影響到白灰的使用效率。
The quality of the water stable mixing plant is also related to the engineering quality. In order to ensure the mixing quality and efficiency, an excavator can be used to overturn it to balance the moisture content of the raw materials. Due to the fact that the moisture content of black ash and white ash is determined by many uncertain factors, especially white ash, the quality of digestion, its own quality, and whether it has been sieved all affect the efficiency of white ash use.
因此,在使用前,要保證白灰的較適宜的施工含水量,要把握合適的開垛時間。開垛后,如果過濕,可以用挖掘機倒翻數(shù)遍,直到達到合適的含水量,既保證了施工效率,又保證了灰劑量。
Therefore, before use, it is necessary to ensure the appropriate construction moisture content of the white ash and grasp the appropriate stacking time. After opening the stack, if it is too wet, you can use an excavator to invert it several times until it reaches the appropriate moisture content, which not only ensures construction efficiency but also ensures the dosage of ash.
水穩(wěn)拌合站的選址也很重要。特別是場區(qū)內(nèi)的運輸是否暢通也關(guān)系著生產(chǎn)效率。因為在生產(chǎn)中,不僅要考慮到裝載機上料的效率,還要考慮運輸車輛不要停滯堵塞,以及進料車輛不要影響現(xiàn)場的施工。
The location of the water stable mixing plant is also important. Especially the smooth transportation within the site area also affects production efficiency. Because in production, not only should the efficiency of loading materials by the loader be considered, but also the transportation vehicles should not be blocked and the feeding vehicles should not affect the on-site construction.
另外裝載機要在捅料人員把料倉篩上的材料捅完時再上料,便于捅料人員作業(yè);但又不能上料太晚,否則就會斷料。所以說水穩(wěn)拌合站效率的提高是由很多因素綜合影響,需要人機及外在因素、內(nèi)在因素各個方面的密切配合。
In addition, the loader needs to load the material after the material on the silo sieve has been poked by the poking personnel, making it easier for the poking personnel to operate; But you cannot feed too late, otherwise it will break the material. So, the improvement of the efficiency of the water stable mixing plant is influenced by a combination of many factors, requiring close cooperation between human and machine, external factors, and internal factors.
1.水穩(wěn)拌合站設(shè)計應(yīng)體現(xiàn)節(jié)約土地、節(jié)約投資、、可持續(xù)結(jié)合、合理實用的原則,并應(yīng)注意防災(zāi)減災(zāi)、文物保護等。
The design of the water stable mixing station should reflect the principles of land conservation, investment conservation, environmental protection and energy conservation, sustainable combination, and reasonable practicality, and should pay attention to disaster prevention and reduction, cultural relic protection, etc.
2.水穩(wěn)拌合站的設(shè)計應(yīng)考慮施工和生產(chǎn),合理劃分?jǐn)嚢枳鳂I(yè)區(qū)、物料計量區(qū)、物料堆放區(qū)和運輸車輛停放區(qū)。生活區(qū)和辦公設(shè)施應(yīng)與生產(chǎn)區(qū)分開,盡量利用附近的房屋和設(shè)施。
The design of the water stable mixing plant should consider construction and production, and reasonably divide the mixing operation area, material metering area, material stacking area, and transportation vehicle parking area. The living area and office facilities should be separated from the production area, and nearby houses and facilities should be utilized as much as possible.
3.水穩(wěn)拌合站的位置和大小應(yīng)根據(jù)交通和工程條件、月施工任務(wù)量大、混合料的峰值強度和使用時間(供應(yīng)半徑不宜大于15km),通過技術(shù)經(jīng)濟比較確定。
The location and size of the water stable mixing station should be determined through technical and economic comparison based on traffic and engineering conditions, large monthly construction tasks, peak strength of the mixture, and service time (supply radius should not exceed 15km).
4.水穩(wěn)拌合站的設(shè)計應(yīng)根據(jù)施工組織設(shè)計綜合考慮,并根據(jù)地形條件提出規(guī)劃設(shè)計方案。土地利用程度根據(jù)月工程量大、積累多等因素確定。根據(jù)混凝土月度任務(wù)量和峰值強度,確定生產(chǎn)能力并考慮備用。
The design of the water stable mixing plant should be comprehensively considered based on the construction organization design, and a planning and design scheme should be proposed according to the terrain conditions. The degree of land use is determined based on factors such as large monthly engineering volume and accumulation. Determine production capacity and consider backup based on monthly concrete task volume and peak intensity.
5.水穩(wěn)拌合站臨時用地應(yīng)按照因地制宜、綜合利用的原則進行復(fù)墾。
5. The temporary land for the water stable mixing station should be reclaimed according to the principle of adapting to local conditions and comprehensive utilization.
6.除按照本辦法外,水穩(wěn)拌合站的設(shè)置應(yīng)符合現(xiàn)行強制性標(biāo)準(zhǔn)。
6. In addition to following this method, the setting of water stable mixing stations should comply with current mandatory standards.
感謝您的閱讀,此文的文章來源:濟南水穩(wěn)攪拌站更多的內(nèi)容和問題請點擊:http://我們會繼續(xù)努力的為您提供服務(wù),感謝您的支持!
Thank you for reading. The source of this article is Jinan Water Stable Mixing Station. For more information and questions, please click: http:// We will continue to work hard to provide you with services. Thank you for your support!