无码人妻av一区二区三区波多野,亚洲国产精品VA在线观看麻豆,国产无码啪啪啪视频,亚洲第一区国产精品

歡迎訪問(wèn)永誠(chéng)廣建公路材料(山東)有限公司網(wǎng)站!

永誠(chéng)廣建公路材料(山東)有限公司

熱線電話

15165180688

您現(xiàn)在所在的位置 :首頁(yè) - 新聞中心 > 行業(yè)資訊

行業(yè)資訊

水穩(wěn)砼的養(yǎng)生是怎么個(gè)情況?

來(lái)源:http:/// 日期:2023-01-28
濟(jì)南水穩(wěn)砼既是保證水泥穩(wěn)定碎石(砂礫)強(qiáng)度的需要,又是減少和避免干縮裂縫的措施。因此,每一段底基層碾壓完成并經(jīng)壓實(shí)度檢測(cè)合格后,應(yīng)立即開始養(yǎng)生,養(yǎng)生宜采用不透水薄膜、濕砂、草袋、棉毯覆蓋并灑水保濕養(yǎng)生。
Jinan water stabilized concrete is not only the need to ensure the strength of cement stabilized crushed stone (gravel), but also the measure to reduce and avoid dry shrinkage cracks. Therefore, after each section of subbase is rolled and passes the compactness test, the curing should be started immediately. The curing should be covered with impermeable film, wet sand, straw bag, cotton blanket, and watered for moisturizing.
基層完成后要及時(shí)交給路面施工單位,進(jìn)行瀝青乳液養(yǎng)生,避免基層長(zhǎng)期暴曬。養(yǎng)生期不宜少于7天,并應(yīng)封閉交通,除灑水車輛外,嚴(yán)禁其它車輛通行?;鶎舆^(guò)冬時(shí),應(yīng)采取覆蓋保溫措施,以防止基層開裂或表面受損可采取先鋪塑料薄膜后覆蓋粘土的措施,減少和避免因溫差過(guò)大時(shí)產(chǎn)生溫縮裂縫。
After the base course is completed, it shall be timely delivered to the pavement construction unit for asphalt lotion curing to avoid long-term exposure of the base course. The curing period should not be less than 7 days, and the traffic should be closed. Except for the watering vehicles, other vehicles are not allowed to pass. During the winter of the base course, the thermal insulation measures shall be taken to prevent the base course from cracking or surface damage. The measures of first laying plastic film and then covering clay can be taken to reduce and avoid temperature shrinkage cracks caused by excessive temperature difference.
水穩(wěn)砼攤鋪后,當(dāng)水穩(wěn)砼的含水量等于或略大于佳含水量時(shí),應(yīng)及時(shí)根據(jù)試驗(yàn)段確定的碾壓工藝,用輕型壓路機(jī)并配合20T以上壓路機(jī)在結(jié)構(gòu)層全寬內(nèi)進(jìn)行碾壓。碾壓段長(zhǎng)度根據(jù)試驗(yàn)段確定的長(zhǎng)度及氣溫情況確定,氣溫高時(shí),水分蒸發(fā)快,縮短碾壓段長(zhǎng)度,反之,可適當(dāng)延長(zhǎng)碾壓段長(zhǎng)度,以40-50米為宜,過(guò)短則易造成平整度較差。
After paving the water stabilized concrete, when the water content of the water stabilized concrete is equal to or slightly greater than the optimum water content, the light roller shall be used in time according to the rolling process determined in the test section, and the roller above 20T shall be used for rolling within the full width of the structural layer. The length of the rolling section is determined according to the length determined by the test section and the temperature. When the temperature is high, the water evaporates quickly and the length of the rolling section is shortened. On the contrary, the length of the rolling section can be appropriately extended, preferably 40-50 meters. If it is too short, it is easy to cause poor flatness.
濟(jì)南水穩(wěn)砼
碾壓方式初壓一般采用膠輪壓路機(jī)或鋼輪壓路機(jī)靜壓1-2遍,復(fù)壓采用振動(dòng)壓路機(jī)弱振強(qiáng)度2-4遍,終壓采用鋼輪壓路機(jī)或膠輪壓路機(jī)靜壓1-2遍,碾壓速度初、終壓宜為1.5-1.7Km/h,復(fù)壓宜為2.0-2.5Km/h,直線和不設(shè)超高的平曲線段,由兩側(cè)路肩向路中心碾壓,設(shè)超高的平曲線段,由內(nèi)側(cè)路肩向外路肩進(jìn)行碾壓。
Rolling method: the initial rolling shall be carried out by rubber wheel roller or steel wheel roller for 1-2 times, the re-rolling shall be carried out by vibratory roller with weak vibration strength for 2-4 times, the final rolling shall be carried out by steel wheel roller or rubber wheel roller for 1-2 times, the initial and final rolling speed shall be 1.5-1.7Km/h, the re-rolling speed shall be 2.0-2.5km/h, the straight line and the flat curve section without superelevation shall be rolled from the shoulders on both sides to the road center, and the flat curve section with superelevation shall be set, Rolling shall be carried out from the inner shoulder to the outer shoulder.
碾壓時(shí),輪跡應(yīng)重疊1/2輪寬。相鄰兩段的接頭處,應(yīng)錯(cuò)成橫向45°的階梯狀碾壓。嚴(yán)禁壓路機(jī)在已完成或正在碾壓的路段上“調(diào)頭”和急剎車。自拌和碾壓結(jié)束原則控制在2h以內(nèi)。您對(duì)該產(chǎn)品還有什么問(wèn)題或者需求都能隨時(shí)來(lái)我們網(wǎng)站http://做咨詢!
When rolling, the wheel track shall overlap 1/2 wheel width. The joints of the two adjacent sections shall be staggered into a 45 ° transverse stepped rolling. It is strictly prohibited for the roller to "turn around" and brake sharply on the road section that has been completed or is being rolled. From mixing to rolling, it shall be controlled within 2h in principle. If you have any questions or needs about this product, please come to our website at any time http:// Consulting!
  • 上一條:土的含水量對(duì)壓路機(jī)壓實(shí)過(guò)程的影響
  • 下一條:提高路面機(jī)械設(shè)備工作穩(wěn)定性的措施
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞: