无码人妻av一区二区三区波多野,亚洲国产精品VA在线观看麻豆,国产无码啪啪啪视频,亚洲第一区国产精品

歡迎訪問(wèn)永誠(chéng)廣建公路材料(山東)有限公司網(wǎng)站!

永誠(chéng)廣建公路材料(山東)有限公司

熱線電話

15165180688

您現(xiàn)在所在的位置 :首頁(yè) - 新聞中心 > 行業(yè)資訊

行業(yè)資訊

攤鋪機(jī)出租之后施工中的注意事項(xiàng)

來(lái)源:http:/// 日期:2022-08-19
在攤鋪機(jī)開(kāi)始施工之前,應(yīng)該先做一系列檢查,確定大型路面機(jī)器設(shè)備沒(méi)有問(wèn)題方可開(kāi)始正常作業(yè),那么攤鋪機(jī)在運(yùn)行的過(guò)程中,我們需要具備怎樣的特殊技術(shù)要求呢?下面跟著濟(jì)南攤鋪機(jī)出租廠家一起來(lái)看看出租攤鋪機(jī)之后施工中的注意事項(xiàng)吧:
Before the construction of the paver, a series of inspections should be carried out to ensure that the large-scale pavement machinery and equipment are free of problems before the normal operation. What special technical requirements do we need to have during the operation of the paver? Let's follow the Jinan paver rental manufacturer to see the precautions in construction after renting the paver:
(1)按照施工的嚴(yán)格要求,合理確定攤鋪機(jī)出租之后的工作速度、攤鋪寬度、攤鋪厚度、刮板輸送器及螺旋分料器轉(zhuǎn)速、斗門(mén)開(kāi)度等技術(shù)參數(shù)。
(1) According to the strict requirements of construction, reasonably determine the working speed, paving width, paving thickness, speed of scraper conveyor and spiral distributor, opening of bucket door and other technical parameters of the paver after leasing.
(2)機(jī)械在傳動(dòng)的瀝青混合料攤鋪機(jī)機(jī),換檔一定須在攤鋪機(jī)完全停止時(shí)進(jìn)行,并嚴(yán)禁用力掛檔。
(2) For the asphalt mixture paver driven by machinery, the gear shift must be carried out when the paver is completely stopped, and it is strictly prohibited to shift with force.
(3)準(zhǔn)備卸料時(shí),攤鋪機(jī)推輪靠近自卸車后輪,自卸車掛空檔。攤鋪機(jī)同時(shí)推動(dòng)兩個(gè)。
(3) When preparing for unloading, the pushing wheel of the paver shall be close to the rear wheel of the dump truck, and the dump truck shall be in neutral. The paver pushes two at the same time.
濟(jì)南攤鋪機(jī)出租
(4)攤鋪機(jī)的所有部件和系統(tǒng),必要時(shí)應(yīng)及時(shí)協(xié)調(diào)和校正。運(yùn)行速度應(yīng)保持穩(wěn)定,停車和啟動(dòng)次數(shù)應(yīng)盡量減少,以保持設(shè)備的連續(xù)和平衡運(yùn)行。
(4) All components and systems of the paver shall be timely coordinated and corrected when necessary. The operation speed shall be stable, and the number of shutdown and startup shall be minimized to maintain the continuous and balanced operation of the equipment.
(5)嚴(yán)禁操作人員在設(shè)備作業(yè)時(shí)離開(kāi)駕駛臺(tái),無(wú)關(guān)人員不得在作業(yè)時(shí)上、下設(shè)備,或在駕駛臺(tái)上停留。
(5) It is strictly prohibited for operators to leave the bridge during equipment operation. Irrelevant personnel are not allowed to get on and off the equipment or stay on the bridge during operation.
(6)攤鋪機(jī)轉(zhuǎn)場(chǎng)后若是在行駛的過(guò)程中,禁止在坡道上換檔,或空檔下坡滑行。攤鋪?zhàn)鳂I(yè)前20-40min,對(duì)熨平板進(jìn)行預(yù)熱,使其接近瀝青混合料的攤鋪溫度;因故暫停作業(yè)時(shí),使用預(yù)熱系統(tǒng)進(jìn)行保溫,防止熨平板冷卻;用電預(yù)熱時(shí),應(yīng)先啟動(dòng)發(fā)動(dòng)機(jī)。
(6) If the paver is running after transfer, it is prohibited to shift gears on the slope or slide down the slope in neutral. Preheat the screed 20-40min before paving to make it close to the paving temperature of asphalt mixture; When the operation is suspended for some reason, the preheating system shall be used for thermal insulation to prevent the screed from cooling; When preheating with electricity, start the engine first.
此外現(xiàn)在很多工程機(jī)械設(shè)備都會(huì)選擇大型正規(guī)公司進(jìn)行租賃,我們?cè)谶x擇攤鋪機(jī)設(shè)備公司的時(shí)候,須多方對(duì)比,簽訂相應(yīng)的租賃合同,主要是了解混凝土攤鋪機(jī)設(shè)備的概況,使用程度,有沒(méi)有嚴(yán)重的損壞,還有租賃期限,所租賃的收費(fèi)情況,這些都是要提前了解清楚的。更多事項(xiàng)就來(lái)我們網(wǎng)站http://咨詢了解吧!
In addition, many construction machinery and equipment will be leased by large-scale regular companies. When we choose the paver equipment company, we must compare with each other and sign the corresponding lease contract. The main purpose is to understand the general situation of the concrete paver equipment, the degree of use, whether there is serious damage, the lease term, and the rental charges. All these should be understood in advance. For more information, please visit our website http:// Consult and understand!
  • 上一條:挖掘機(jī)租賃公司應(yīng)該注意什么
  • 下一條:好好使用挖掘機(jī)就要多了解相關(guān)事項(xiàng)
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞: