濟南挖掘機租賃使用雨天作業(yè)時對路況的要求
來源:http:/// 日期:2022-04-08
濟南挖掘機租賃如何是比較合適大部分施工方的一個方法,因為有些時候的施工時間比較短,不值得去買一輛挖掘機,所以租賃就成為了大多數(shù)人的選擇。那么下面我們來講一個問題--濟南挖掘機租賃使用雨天作業(yè)時對路況的要求。
Ji 'nan excavator lease is a method that is more suitable for most of the construction side, because sometimes the construction time is short, it is not worth buying a excavator, so the lease has become the choice of most people. So let's talk about a problem -- the requirements of road conditions for jinan excavator leasing in rainy days.
雨天作業(yè)格外留意路面和周圍環(huán)境的狀況。特別是礦山或者建筑工地除了塘石路面基本全是土路,在大雨過后的路況環(huán)境異常復(fù)雜,坑洼以及濕滑、稀泥堆積難以進行作業(yè),因此要先確保自身再進行救援,量力而行,避免造成塌陷或者泥石流,造成不必要的影響。
Pay special attention to the road and the surrounding environment in rainy days. In particular, except for tangshi road surface, mine or construction site is basically all dirt road. After heavy rain, the road environment is extremely complex, and it is difficult to carry out operations due to the accumulation of potholes, wet and mud. Therefore, it is necessary to ensure their own safety before rescue, act according to one's ability to avoid collapse or debris flow, causing unnecessary impact.
濟南挖掘機租賃認為如果需要作業(yè)的話要注意魚塘和清淤這類的作業(yè)要做好現(xiàn)場勘察工作,帶好鋼繩和鋼板在下去。如果塘底和坡子上面的泥較軟,斗放下去基本都淹沒了,那這個活就不要在做了;有的表面看似干透了,但是幾十公分下去還是稀泥和沙子,下去之后肯定會陷車;塘底已經(jīng)滿足條件,但是坡子都是稀泥也會導(dǎo)致挖掘機下陷。
Ji 'nan excavator leasing thinks that if you need to work, you should pay attention to fish pond and dredging operations like this to do a good job of site investigation, with steel rope and steel plate in the bottom. If the mud at the bottom of the pond and above the slope is soft and the bucket is almost submerged, then the work should not be done any more; Some surface seems to be dry, but dozens of centimeters down or mud and sand, after the car will definitely sink; The bottom of the pond has met the conditions, but the slope is mud will also lead to the subsidence of the excavator.
所以雨天作業(yè)動作要輕柔,坡道上車先鏟除稀泥,如果有條件可以鏟一些砂石鋪設(shè)路面,防止車輛打滑。另外對于太接近山崖,水溝的邊際的路況,機器會容易側(cè)翻,為了考慮可盡量避免此類作業(yè)。
So the rainy day operation should be gentle, the ramp on the first to remove mud, if conditions can shovel some sand paving, to prevent vehicle skidding. In addition, if the road is too close to the cliff and the edge of the ditch, the machine will easily roll over. For safety reasons, such operations can be avoided as far as possible.
We will explain the problem here. In the process of use, we should ensure our own safety, because a person's life is only once, and the use of the excavator is not urgent. So more questions you can come to us here consultation understanding.